What We’ve Done

From first consultation to final sign-off, Alia Steel Fixing works closely with its commercial, residential, and government construction clients to deliver premium-quality steelwork, every time.

HS2

BIRMINGHAM

NLHPP

EDMONTON | LONDON

ELEPHANT PARK H7

HEYGATE STREET | LONDON

LIDL DISTRIBUTION CENTRE

LUTON

30 SOUTH COLONNADE

CANARY WHARF | LONDON

BANKSIDE YARD WEST

BLACKFRIARS | LONDON

ROYAL GREENWICH TRUST SCHOOL

CHARLTON | LONDON

ROYAL COLLEGE OF ARTS

BATTERSEA | LONDON

1 TRITON SQUARE

EUSTON | LONDON

LYMINGTON FIELDS SCHOOL

DAGENHAM | LONDON

HYDRO

YEOMAN STREET | LONDON

THE LONDONER HOTEL

LEICESTER SQUARE | LONDON

HOPE WHARF

GREENWICH | LONDON

ONE CROWN PLACE

LIVERPOOL STREET | LONDON

THE FISHERIES

LONDON FIELDS PARK | LONDON

AURUM | COMMERCIAL DEVELOPMENT

LOMBARD STREET | LONDON

THE PRINCE PHILIP MARITIME COLLECTION CENTRE

KIDBROOKE | LONDON

ORCHARD LODGE

ANERLEY | LONDON

HS2

2025 FEB – ONGOING

HS2 Description.

LOCATION: BIRMINGHAM

CLIENT: CLIENT: BYRNE BROS

Photo Credit: https://northlondonheatandpower.london/

Photo Credit: https://northlondonheatandpower.london/

NORTH LONDON HEAT AND POWER PROJECT – EDMONTON ECOPARK REDEVELOPMENT

2023 MAY – ONGOING

The £1.2 billion North London Heat and Power Project is one of the UK’s largest and most ambitious waste infrastructure redevelopments. Led by North London Waste Authority, it serves over 2 million residents across seven London boroughs and manages around 850,000 tonnes of waste per year.

Central to the project is the construction of a world-class Energy Recovery Facility, designed to:
• Generate up to 78 megawatts of electricity – enough to power 127,000 homes
• Supply low-carbon heating and hot water to 60,000 homes and businesses
• Operate with best-in-class emissions technology to improve local air quality
• Be Carbon Capture and Storage (CCS)–ready, helping support the UK’s Net Zero targets

The redevelopment also includes:
• A new Resource Recovery Facility to boost recycling capacity
• 225 on-site training placements and 100+ apprenticeships for local residents
• A carbon saving equivalent to removing 110,000 cars from the road annually
• A long-term reduction in landfill dependency for over 50 years

This flagship project sets a new national standard for green energy recovery and sustainable waste management, unlocking significant environmental, social, and economic benefits for north London and beyond.

LOCATION: EDMONTON, LONDON

CLIENT: BYRNE BROS

ELEPHANT PARK H7

2021 SEPT – ONGOING

A residential-led development compromising 424 flats in two nine-storey mansion blocks and a 25-storey tower, and 1,865sqm of Class A, D1 and D2 uses across the ground floor.

LOCATION: HEYGATE STREET | ELEPHANT PARK | LONDON

CLIENT: BYRNE BROS

LIDL DISTRIBUTION CENTRE

2021 AUG – 2021 DEC

The new warehouse, which is approximately 1,000,000ft², will be Lidl’s largest in the UK at double the size of any of its other warehouses across Great Britain.

The development comprises the construction of a Regional Distribution Centre (RDC) of over 1.2 million sq ft of warehouse floor space, 612 associated car parking spaces, 141 HGV stacking spaces, 196 loading docks, 20 E-charging spaces, a drivers lounge, smoking shelters, two bicycle stores with 104 spaces for bicycles, four haulier cabins, three battery enclosures, a generator enclosure, sprinkler tanks, pump house hydrant tanks, gas and electric substations, 2 bus stops on Woodside Link, and a comprehensive landscaping scheme.

LOCATION: LUTON | LU4 9TX

CLIENT: BYRNE BROS

30 SOUTH COLONNADE

2021 JUNE – ONGOING

The project involves the major refurbishment and repositioning of a highly prominent 300,000 sq ft office building in the core of the Canary Wharf Estate.

LOCATION: CANARY WHARF | LONDON

CLIENT: MCGEE

BANKSIDE YARD WEST

2019 JUNE – 2021 NOV

The UK’s first fossil fuel-free major-mixed use a 1.4 million sq ft development; The new riverside landmark features eight new buildings, including a series of towers, the highest of which is reaching 50 storeys.

LOCATION: BLACKFRIARS | LONDON | SE1

CLIENT: MCGEE

ROYAL GREENWICH TRUST SCHOOL

2019 MAY – 2019 AUG

The School includes brand new classrooms, new science laboratories, a dance and drama studio, music facilities, a large multi-purpose atrium and a four court sports hall.

LOCATION: CHARLTON | LONDON

CLIENT: O’KEEFE

ROYAL COLLEGE OF ARTS

2019 APRIL – 2020 JULY

Royal College of Art’s South London student campus in Battersea. Designed by world-renowned architects Hezog & Meuron. The 16,500 m2 centre consists of a 4-storey Academic Studio Building and a 8-storey Research Building. The new campus is the largest investment in new, transformational space in the RCA’s 180+ year history.

LOCATION: BATTERSEA | LONDON

CLIENT: BYRNE BROS

1 TRITON SQUARE

2018 NOV – 2019 JUNE

One Triton Square office building. It’s 366,000 sq ft redevelopment, which increases the lettable area by 127,000 sq ft and includes 20,000 sq ft of retail and leisure at ground floor and 10,000 sq ft of workspace.

LOCATION: REGENT’S PLACE | EUSTON | NQ1 3DX

CLIENT: BYRNE BROS

LYMINGTON FIELDS SCHOOL

2018 MARCH – 2019 MARCH

Lymington Fields is Europe’s largest school with over 4,000 pupils. Building Project of the Year |2020

LOCATION: DAGENHAM | LONDON

CLIENT: O’KEEFE

HYDRO | RESIDENTIAL DEVELOPMENT

2018 MARCH – 2018 SEPT

HYDRO is a Residential Development. A mix of 1, 2 and 3 bedroom apartments. Specifically designed children’s play area next to the building.

LOCATION: YEOMAN STREET | SURREY QUAYS

CLIENT: O’KEEFE

THE LONDONER HOTEL

2018 – 2019

Edwardian Hotel in Leicester Square, The Londoner. The five-star 15-level luxury Hotel ‘The Londoner’ has one of the deepest commercial basements in Europe which hold two Odeon Luxe cinemas, ballroom, spa and conference facilities. In the nine ground levels, there will be 350 bedrooms, including 35 luxury suites, concept restaurants and lounges.

LOCATION: LEICESTER SQUARE | LONDON

CLIENT: MCGEE

HOPE WHARF | RESIDENTIAL DEVELOPMENT

2017 OCT – 2018 AUG

Hope Wharf is a Residential Development. A mix of 122 high quality 1, 2 and 3 bedroom apartments, 513 sq.m. of commercial space to support local businesses. Specifically designed children’s play area and car parking spaces for residents.

LOCATION: GREENWICH | SE10 8JL

CLIENT: O’KEEFE GROUP

ONE CROWN PLACE

2017 OCT – 2018 JAN

One Crown Place has now joined one of the world’s most recognisable skylines. Home to 246 new apartments, 15,500 sq m high-quality office space with a variety of retail space at ground level. The boutique hotel and members’ club occupy the elegant row of Georgian terraces on Sun Street.

LOCATION: LIVERPOOL STREET | LONDON

CLIENT: O’KEEFE

THE FISHERIES

2016 OCT – 2017 JUNE

A modern set of 31 residential homes in Mentmore Terrace and 1724sqm of B1 commercial space arranged over the ground, first and basement levels.

LOCATION: LONDON FIELDS PARK | LONDON

CLIENT: O’KEEFE

AURUM | COMMERCIAL DEVELOPMENT

2016 SEPT – 2017 OCT

Aurum is an office building. The building provides 58,000 sq ft of exceptional quality office space. Grade A office building is set across 11 floors and benefits from column-free floor space and excellent natural light as a result of its corner location. The building also have a lower ground floor and a basement.

LOCATION: 30-32 LOMBARD STREET | LONDON

CLIENT: MCGEE

THE PRINCE PHILIP MARITIME COLLECTION CENTRE

2016 AUG – 2016 OCT

Royal Museums Greenwich upgraded their conservation studios and storage facilities with a new Collections and Conservation Centre. The Prince Philip Maritime Collections Centre for RMG includes a maritime history collections, learning centre for school children and researchers.

LOCATION: KIDBROOKE | LONDON | SE3 9QS

CLIENT: O’KEEFE

ORCHARD LODGE | RESIDENTIAL DEVELOPMENT

2016 MARCH – 2017 OCT

Orchard Lodge is an exclusive development of 1, 2 & 3 bedroom new build apartments in the Anerley area of Bromley district with allocated basement parking and just minutes from the Crystal Palace Triangle.

LOCATION: ANERLEY | LONDON | SE20 8BX

CLIENT: O’KEEFE

Connect with us

© 2025 Alia Steel Fixing Ltd

Cookie Preference