From first consultation to final sign-off, Alia Steel Fixing works closely with its commercial, residential, and government construction clients to deliver premium-quality steelwork, every time.
2025 FEB – ONGOING
HS2 Description.
LOCATION: BIRMINGHAM
CLIENT: CLIENT: BYRNE BROS
Photo Credit: https://northlondonheatandpower.london/
Photo Credit: https://northlondonheatandpower.london/
2023 MAY – ONGOING
The £1.2 billion North London Heat and Power Project is one of the UK’s largest and most ambitious waste infrastructure redevelopments. Led by North London Waste Authority, it serves over 2 million residents across seven London boroughs and manages around 850,000 tonnes of waste per year.
Central to the project is the construction of a world-class Energy Recovery Facility, designed to:
• Generate up to 78 megawatts of electricity – enough to power 127,000 homes
• Supply low-carbon heating and hot water to 60,000 homes and businesses
• Operate with best-in-class emissions technology to improve local air quality
• Be Carbon Capture and Storage (CCS)–ready, helping support the UK’s Net Zero targets
The redevelopment also includes:
• A new Resource Recovery Facility to boost recycling capacity
• 225 on-site training placements and 100+ apprenticeships for local residents
• A carbon saving equivalent to removing 110,000 cars from the road annually
• A long-term reduction in landfill dependency for over 50 years
This flagship project sets a new national standard for green energy recovery and sustainable waste management, unlocking significant environmental, social, and economic benefits for north London and beyond.
LOCATION: EDMONTON, LONDON
CLIENT: BYRNE BROS
2021 SEPT – ONGOING
A residential-led development compromising 424 flats in two nine-storey mansion blocks and a 25-storey tower, and 1,865sqm of Class A, D1 and D2 uses across the ground floor.
LOCATION: HEYGATE STREET | ELEPHANT PARK | LONDON
CLIENT: BYRNE BROS
2021 AUG – 2021 DEC
The new warehouse, which is approximately 1,000,000ft², will be Lidl’s largest in the UK at double the size of any of its other warehouses across Great Britain.
The development comprises the construction of a Regional Distribution Centre (RDC) of over 1.2 million sq ft of warehouse floor space, 612 associated car parking spaces, 141 HGV stacking spaces, 196 loading docks, 20 E-charging spaces, a drivers lounge, smoking shelters, two bicycle stores with 104 spaces for bicycles, four haulier cabins, three battery enclosures, a generator enclosure, sprinkler tanks, pump house hydrant tanks, gas and electric substations, 2 bus stops on Woodside Link, and a comprehensive landscaping scheme.
LOCATION: LUTON | LU4 9TX
CLIENT: BYRNE BROS
2021 JUNE – ONGOING
The project involves the major refurbishment and repositioning of a highly prominent 300,000 sq ft office building in the core of the Canary Wharf Estate.
LOCATION: CANARY WHARF | LONDON
CLIENT: MCGEE
2019 JUNE – 2021 NOV
The UK’s first fossil fuel-free major-mixed use a 1.4 million sq ft development; The new riverside landmark features eight new buildings, including a series of towers, the highest of which is reaching 50 storeys.
LOCATION: BLACKFRIARS | LONDON | SE1
CLIENT: MCGEE
2019 MAY – 2019 AUG
The School includes brand new classrooms, new science laboratories, a dance and drama studio, music facilities, a large multi-purpose atrium and a four court sports hall.
LOCATION: CHARLTON | LONDON
CLIENT: O’KEEFE
2019 APRIL – 2020 JULY
Royal College of Art’s South London student campus in Battersea. Designed by world-renowned architects Hezog & Meuron. The 16,500 m2 centre consists of a 4-storey Academic Studio Building and a 8-storey Research Building. The new campus is the largest investment in new, transformational space in the RCA’s 180+ year history.
LOCATION: BATTERSEA | LONDON
CLIENT: BYRNE BROS
2018 NOV – 2019 JUNE
One Triton Square office building. It’s 366,000 sq ft redevelopment, which increases the lettable area by 127,000 sq ft and includes 20,000 sq ft of retail and leisure at ground floor and 10,000 sq ft of workspace.
LOCATION: REGENT’S PLACE | EUSTON | NQ1 3DX
CLIENT: BYRNE BROS
2018 MARCH – 2019 MARCH
Lymington Fields is Europe’s largest school with over 4,000 pupils. Building Project of the Year |2020
LOCATION: DAGENHAM | LONDON
CLIENT: O’KEEFE
2018 MARCH – 2018 SEPT
HYDRO is a Residential Development. A mix of 1, 2 and 3 bedroom apartments. Specifically designed children’s play area next to the building.
LOCATION: YEOMAN STREET | SURREY QUAYS
CLIENT: O’KEEFE
2018 – 2019
Edwardian Hotel in Leicester Square, The Londoner. The five-star 15-level luxury Hotel ‘The Londoner’ has one of the deepest commercial basements in Europe which hold two Odeon Luxe cinemas, ballroom, spa and conference facilities. In the nine ground levels, there will be 350 bedrooms, including 35 luxury suites, concept restaurants and lounges.
LOCATION: LEICESTER SQUARE | LONDON
CLIENT: MCGEE
2017 OCT – 2018 AUG
Hope Wharf is a Residential Development. A mix of 122 high quality 1, 2 and 3 bedroom apartments, 513 sq.m. of commercial space to support local businesses. Specifically designed children’s play area and car parking spaces for residents.
LOCATION: GREENWICH | SE10 8JL
CLIENT: O’KEEFE GROUP
2017 OCT – 2018 JAN
One Crown Place has now joined one of the world’s most recognisable skylines. Home to 246 new apartments, 15,500 sq m high-quality office space with a variety of retail space at ground level. The boutique hotel and members’ club occupy the elegant row of Georgian terraces on Sun Street.
LOCATION: LIVERPOOL STREET | LONDON
CLIENT: O’KEEFE
2016 OCT – 2017 JUNE
A modern set of 31 residential homes in Mentmore Terrace and 1724sqm of B1 commercial space arranged over the ground, first and basement levels.
LOCATION: LONDON FIELDS PARK | LONDON
CLIENT: O’KEEFE
2016 SEPT – 2017 OCT
Aurum is an office building. The building provides 58,000 sq ft of exceptional quality office space. Grade A office building is set across 11 floors and benefits from column-free floor space and excellent natural light as a result of its corner location. The building also have a lower ground floor and a basement.
LOCATION: 30-32 LOMBARD STREET | LONDON
CLIENT: MCGEE
2016 AUG – 2016 OCT
Royal Museums Greenwich upgraded their conservation studios and storage facilities with a new Collections and Conservation Centre. The Prince Philip Maritime Collections Centre for RMG includes a maritime history collections, learning centre for school children and researchers.
LOCATION: KIDBROOKE | LONDON | SE3 9QS
CLIENT: O’KEEFE
2016 MARCH – 2017 OCT
Orchard Lodge is an exclusive development of 1, 2 & 3 bedroom new build apartments in the Anerley area of Bromley district with allocated basement parking and just minutes from the Crystal Palace Triangle.
LOCATION: ANERLEY | LONDON | SE20 8BX
CLIENT: O’KEEFE
© 2025 Alia Steel Fixing Ltd