PROJECTS – THE GREEN QUARTER

THE GREEN QUARTER 2026 APRIL – ONGOING LOCATION: SOUTHALL | LONDON CLIENT: STATOM GROUP The Green Quarter is a major mixed-use regeneration development in Southall, transforming a former gasworks site into a new residential neighbourhood with landscaped public spaces and community facilities. Alia Steel Fixing is carrying out steel fixing works on the project.

PROJECTS – HARVEST HILL

HARVEST HILL 2026 APRIL – ONGOING LOCATION: MAIDENHEAD CLIENT: MV KELLY Harvest Hill is an ongoing residential project in Maidenhead with MV Kelly. Alia Steel Fixing is carrying out steel fixing works on site, providing reliable labour, accurate reinforcement installation, and coordinated support throughout the programme.

PROJECTS – PECKHAM – FIX ‘N GO

FIX ‘N GO 2026 APRIL LOCATION: PECKHAM | LONDON This Peckham project was delivered through our Fix ’n Go™ service, providing responsive steel fixing support for a one-off scope within a tight programme. The works required a flexible approach on site, ensuring progress was maintained and aligned with ongoing project requirements.

PROJECTS – KING’S ROAD PARK – PHASE 4

projects_thumbnail_00000020_Fulham_Kings_Road_Park_P4

KING’S ROAD PARK – PHASE 4 2026 MAR – ONGOING LOCATION: FULHAM | LONDON CLIENT: STATOM GROUP King’s Road Park is a major residential development in Fulham, delivered by St William (Berkeley Group) as part of the regeneration of a former gasworks site. Phase 4 comprises residential towers and a podium structure within a large-scale […]

PROJECTS – BERMONDSEY – FIX ‘N GO

FIX ‘N GO 2025 SEPT LOCATION: BERMONDSEY | LONDON This Bermondsey project showcases the efficiency and reliability of our Fix ’n Go service. Delivered within a tight timeframe, the works involved a one-off steel-fixing package requiring precision, speed, and seamless coordination. Our team provided trusted expertise from start to finish, ensuring the project was completed […]

PROJECTS – ORCHARD LODGE | RESIDENTIAL DEVELOPMENT

ORCHARD LODGE 2016 MARCH – 2017 OCT LOCATION: ANERLEY | LONDON CLIENT: O’KEEFE Orchard Lodge is an exclusive development of 1, 2 & 3 bedroom new build apartments in the Anerley area of Bromley district with allocated basement parking and just minutes from the Crystal Palace Triangle.

PROJECTS – THE PRINCE PHILIP MARITIME COLLECTION CENTRE

THE PRINCE PHILIP MARITIME COLLECTION CENTRE 2016 AUG – 2016 OCT LOCATION: KIDBROOKE | LONDON CLIENT: O’KEEFE Royal Museums Greenwich upgraded their conservation studios and storage facilities with a new Collections and Conservation Centre. The Prince Philip Maritime Collections Centre for RMG includes a maritime history collections, learning centre for school children and researchers.

PROJECTS – AURUM | COMMERCIAL DEVELOPMENT

AURUM | COMMERCIAL DEVELOPMENT 2016 SEPT – 2017 OCT LOCATION: LOMBARD STREET | LONDON CLIENT: MCGEE Aurum is an office building. The building provides 58,000 sq ft of exceptional quality office space. Grade A office building is set across 11 floors and benefits from column-free floor space and excellent natural light as a result of […]

PROJECTS – THE FISHERIES

THE FISHERIES 2016 OCT – 2017 JUNE LOCATION: LONDON FIELDS PARK | LONDON CLIENT: O’KEEFE A modern set of 31 residential homes in Mentmore Terrace and 1724sqm of B1 commercial space arranged over the ground, first and basement levels.

PROJECTS – ONE CROWN PLACE

ONE CROWN PLACE 2017 OCT – 2018 JAN LOCATION: LIVERPOOL STREET | LONDON CLIENT: O’KEEFE One Crown Place has now joined one of the world’s most recognisable skylines. Home to 246 new apartments, 15,500 sq m high-quality office space with a variety of retail space at ground level. The boutique hotel and members’ club occupy […]